Friday, April 17, 2020

Baby got bungs.

So the AN10 bungs and header are done and I did some mock up last night using the downpipe I had handy. It's still tight and I will 100% need a custom radiator at some point. Right now the Mishimoto EG will have to do the gangster lean.
Things left to do:
  • Mount breather chamber and run lines.
  • remove Ebay BOV mount and weld on Tial mount to charge pipe
  • Mount and wire Hondata boost controller.
  • Tidy up wiring.
  • Run vacuum lines.
  • Cut and weld AN16 fittings to radiator. (AN16 modified thermostat housing and radiator neck on head coming from SpeedFactory)
  • Mock up downpipe to correct dimensions.
  • Weld new angles for wastegate pipe.
  • Figure out routing and weld exhaust.
  • Send out valve cover for wrinkle coating.
  • Remove driveshaft??
  • Get a tune.
  • Get custom radiator made.
Not too much left. I'm debating removing the driveshaft after we get the exhaust routed so that it will be easier to tow, and I won't have to worry about driveline issues on the dyno.





No comments:

Post a Comment